This document is a tentative interim amendment to NFPA 99, which covers the design, installation, and operation of health care facilities. It adds a new chapter on heating, ventilation, and air conditioning (HVAC) systems, with requirements for energy conservation, commissioning, piping, ductwork, acoustics, and medical gas storage or transfilling.